Follow these easy steps to get your Hotpoint HTS15BBMAA Refrigerator up and running in no time.

1. Unpacking the Refrigerator

Carefully remove all packaging materials, including any protective film and tape, from the refrigerator. Ensure that all accessories such as shelves, bins, and trays are included.

2. Choosing the Location

Place the refrigerator in a location that allows for proper air circulation and is not exposed to direct sunlight. Ensure there is enough space for the door to open fully and that the unit is level to prevent any operational issues.

3. Leveling the Refrigerator

Use a level to ensure the refrigerator is standing upright. Adjust the leveling legs located at the front of the unit to achieve a stable and level position.

4. Connecting the Power

Plug the refrigerator into a properly grounded outlet. Ensure the power cord is not pinched or damaged during installation.

5. Adjusting the Temperature Controls

Set the temperature controls to the recommended initial settings. Allow the unit to cool for several hours before adjusting the settings to your preference.

6. Installing the Shelves and Bins

Refer to the user manual to properly install all shelves and bins as per your storage needs. Ensure they are securely in place to avoid any accidents.

7. Clearing the Air Path

Ensure the rear of the refrigerator is at least one inch away from the wall to allow for proper air circulation. This helps in maintaining efficient cooling performance.

8. Allowing the Refrigerator to Cool

Give the refrigerator time to reach the optimum cooling temperature before storing any food items. This can take several hours depending on the initial temperature setting.

Hotpoint HTS15BBMAA

;