Follow these easy steps to get your Zanussi MN11720CL Refrigerator up and running in no time.

1. Initial Inspection

Upon receiving the refrigerator, inspect the unit for any visible damage that might have occurred during transportation. Ensure that all components are present and free from defects.

2. Location Selection

Choose a suitable location for installation. The area should be well-ventilated and free from extreme temperature fluctuations. Ensure there is sufficient space around the unit for maintenance and operation.

3. Electrical Connection

Connect the unit to a power supply of 230 V, 1N, 50 Hz. Use a dedicated electrical outlet to prevent overloading circuits. It's recommended to have a qualified electrician perform this task.

4. Panel Assembly

Assemble the wall and ceiling panels using the twin hook fasteners provided. Ensure perfect alignment of panels to minimize temperature loss. The fasteners are designed to provide a secure grip and can be easily disassembled if needed.

5. Refrigeration Unit Installation

Install the built-in refrigeration unit. Ensure all connections are tight and secure. The unit should be precharged with gas, so no additional refrigerant is necessary unless specified.

6. Door Installation

Attach the door using the cam-lift hinges. Ensure the airtight magnetic door gaskets are properly aligned to provide optimal insulation. Check for smooth operation and proper sealing.

7. Temperature Settings

Set the desired temperature using the digital thermostat control on the control panel. Ensure the set temperature is appropriate for your storage needs, typically between -2ºC to +8ºC.

8. Final Checks

Before loading any products, perform a final inspection to ensure all components are functioning correctly. Check the operation of the internal light, defrosting cycle, and temperature display.

Zanussi MN11720CL

;