Follow these easy steps to get your Zanussi MN11720RCL Refrigerator up and running in no time.
Carefully remove the refrigerator from the packaging. Ensure that the location for installation is well-ventilated, allowing for efficient operation. Make sure the room temperature is between -2ºC and +8ºC, as this is the optimal operating environment for the model.
Assemble the wall and ceiling panels using the twin hook fasteners provided. These fasteners allow perfect alignment and secure grip, ensuring minimal temperature loss. All panels are cladded with anti-scratch prepainted galvanized steel for durability.
Ensure all panels are insulated with injected polyurethane. Check that the PVC gaskets are foamed in place to maintain an airtight seal, eliminating any need for additional sealing on site.
The galvanized steel floor should be covered with a non-abrasive, non-slip, ribbed plastic coat. Ensure that the flooring is even, and the corners are rounded for safety and ease of cleaning.
Install the right-hinged door, which comes as standard. The door features smooth rounded profiles, airtight magnetic gaskets, and is designed for high insulation to save energy. A left-hinged door is available upon request.
Connect the cooling unit and piping, which are precharged with gas. The unit can be directly inset on the wall or connected remotely, depending on the spatial and ventilation constraints of the installation site.
Ensure the electrical connection is set to 230V, 1N, 50Hz. Verify that all switches, including the luminous ON/OFF switch and the internal lighting switch, are functioning properly.
Conduct a thorough check of the control panel, including the temperature and thermostat controls with digital display. Test the defrosting cycle and ensure the defrosting through heated gas is operational. Make any necessary adjustments to achieve optimal function.