Follow these easy steps to get your Zanussi ZCFF7/5W Refrigerator up and running in no time.
Remove all transit packaging, including the door transit retainers located under the plinth and shelf retainers.
Locate the appliance in a well-ventilated, dry room and ensure that it is not obstructed by any objects.
Parts which heat up should not be exposed. The back of the appliance should be close to a wall, leaving the required distance for ventilation.
Ensure that the appliance is level to prevent vibration and noise.
Ensure the appliance is connected to the correct power supply of 220-240V / 50Hz.
Any electrical work required to install this appliance should be carried out by a qualified electrician or competent person.
The appliance should be left for 2 hours after installation before it is turned on, to allow the refrigerant to settle.