Follow these easy steps to get your Zanussi MN05416RCL Refrigerator up and running in no time.

1. Initial Inspection

Before setting up the Zanussi Professional Refrigerator, carefully inspect the delivered items for any visible damage. Verify that all components and accessories are included as per the product specifications.

2. Select Installation Location

Choose a well-ventilated area with a stable environment to install your refrigerator. Ensure it's away from direct sunlight, heat sources, and moisture. The location should support the weight and dimensions of the unit.

3. Electrical Requirements

Ensure the power supply is compatible with the refrigerator's specifications: 230 V, 1N, 50 Hz. Install a dedicated electrical outlet to avoid overloading circuits.

4. Assemble the Unit

Follow the assembly instructions to align and secure the wall and ceiling panels using the twin hook fasteners. These fasteners ensure perfect alignment and minimal temperature loss.

5. Install the Refrigeration Unit

Connect the refrigeration unit to the pre-fitted and insulated pipes using the fast connectors. The unit can be installed directly on the wall or remotely if space or temperature conditions require.

6. Attach Doors

Install the right-hinged door, ensuring the cam-lift action hinges and magnetic gaskets are properly aligned for airtight sealing.

7. Final Adjustments

Check that all panels are securely fastened and the door operates smoothly. Ensure that the internal light and fans function correctly, especially if a microswitch is present.

8. Initial Power-Up

Switch on the refrigerator using the luminous ON/OFF switch located on the control panel. Monitor the operation indicators, defrost cycle, and temperature settings via the digital display.

9. Temperature Setting

Set the desired temperature within the range of -2°C to +8°C using the thermostat control. Allow the refrigerator to stabilize at the set temperature before loading any perishable items.

Zanussi MN05416RCL

;